API Expansion for Water Purification
-
Coppell, Texas690 SFBeck – Architecture Beck – Construction
Our design and construction team worked together on this 690 SF project that consists of an added building to house an expansion to the existing validated USP purified water system. This scope included installation of a 10,000 PW storage tank, thermal fluid distribution skid, PW distribution skids, and two thermal fluid/PW heat exchangers, with owner provided contractor installed instrumentation. To complete the project, a purified water system cut-over was completed bringing the system on line within the facility.