API Manufacturing Facility
-
Coppell, Texas21,000 SFBeck – Architecture Beck – Construction
This Project consists of completing the installation of two of their manufacturing trains at the lokelma supply site. Previously, work began on trains 5 and 6 under a previous contractor when construction was put on hold. We were tasked with completing construction which was approximately 30-80% complete, depending on the system. Scopes of work included process piping, mechanical, and electrical among others. Both trains consist of a reactor room and a filter dryer room fed by a centrally located technical area.