Poudre Valley Hospital

  • Fort Collins, Colorado
    142,000 SF
    Beck – Preconstruction, Construction
    Altus Architectural Studios – Architecture

The Beck Group successfully completed preconstruction and construction services for UCHealth’s Poudre Valley Hospital. The project encompassed a substantial 142,000 SF of both renovation and new construction. The extensive site redesign transformed the hospital’s front entrance and pre- and post-operation service areas, creating a more welcoming and efficient environment for patients and staff. Additionally, Beck built a new, modern lobby and completely revamped the labor and delivery department, enhancing the overall functionality and aesthetic of the facility.